Announcement of Ministry of Housing and Urban-Rural Development of the People's Republic of China
Foreword
1 General
2 Terms
3 Requirements of Electric Power System on Fossil Fired Power Plants
3.1 Basic Requirement
3.2 Technical Requirements on the Connection of Power Plant to the Power System
3.3 Requirements on Operating and Regulating Performance of Generating Units
3.4 Requirements on the Operation Capability of the Units under Abnormal Conditions
4 Overall Planning
4.1 Basic Requirement
4.2 Off-site Planning
4.3 Plant Area Planning and General Layout
5 Unit Type Selection
5.1 Unit Parameters
5.2 Type Selection of Main Equipment
5.3 Capacity Matching between Main Equipment
5.4 Design Performance Indicators of Units
6 General Arrangement of Main Power House
6.1 Basic Requirement
6.2 Arrangement of Turbine House and Deaerator Bay
6.3 Arrangement of Coal Bunker Bay
6.4 Arrangement of Boiler
6.5 Main Control Room and Electronic Equipment Room
6.6 Arrangement of Flue Gas Desulphurization Facilities
6.7 Arrangement of Flue Gas Denitration Facilities
6.8 Maintenance
6.9 Requirements on Comprehensive Facilities
7 Coal Handling System
7.1 Basic Requirement
7.2 Coal Unloading Facilities
7.3 Coal Storage Facilities
7.4 Belt Conveyor
7.5 Screening and Crushing Devices
7.6 Coal Mixing Facilities
7.7 Coal Handling System for Circulating Fluidized Bed(CFB)Boiler
7.8 Limestone Milling System for CFB Boilers
7.9 Auxiliary Coal Handling Facilities
8 Boiler Equipment and System
8.1 Boiler Equipment
8.2 Pulverized Coal Preparation
8.3 Air and Flue Gas System
8.4 Flue Gas Precipitator and Emission System
8.5 Start-up System of Once-Through Boilers
8.6 Ignition and Combustion Supporting Fuel System
8.7 Auxiliary Systems of Boilers
8.8 Startup Boiler
8.9 Circulating Fluidized Bed(CFB)Boilers
9 Ash Handling System
9.1 Basic Requirement
9.2 Bottom Ash Handling System
9.3 Fly Ash Handling System
9.4 Ash Handling System Outside the Power Plant
9.5 Auxiliary Facilities
9.6 Ash Disposal Area
10 Flue Gas Desulphurization System
10.1 Basic Requirement
10.2 Absorbent Preparation System
10.3 Sulfur Dioxide Absorbing System
10.4 Flue Gas System
10.5 Desulphurization by-Product Treatment System
11 Flue Gas Denitration Reaction System
11.1 Basic Requirement
11.2 Reducing Agent Storage and Supply System
11.3 Flue Gas Denitration Reaction System
11.4 Ammonia/Air Mixing and Injecting System
12 Steam Turbine Equipment and Systems
12.1 Steam Turbine Equipment
12.2 Main Steam,Reheat Steam and Bypass System
12.3 Feedwater System
12.4 Deaerator and Feedwater Storage Tank
12.5 Condensate System
12.6 Drainage System
12.7 Cooling Water System of Auxiliary Equipment
12.8 Auxiliary System and Equipment of Cogeneration Units
12.9 Condenser and Its Auxiliary Facilities
13 Water Treatment System
13.1 Water Quality and Water Pretreatment
13.2 Water Pre-desalination
13.3 Boiler Makeup Water Treatment
13.4 Steam Turbine Condensate Polishing
13.5 Cooling Water Treatment
13.6 Chemical Dosing and Water-Steam Sampling for Thermal Process System
13.7 Treatment for Makeup Water of District Heating System and Industrial Return Water
13.8 Wastewater Treatment
13.9 Chemical Storage
14 Information System
14.1 Basic Requirement
14.2 Overall Plan of Plant Information System
14.3 Supervisory Information System for Plant Level
14.4 Management Information Systems
14.5 Price Bidding System
14.6 Video Monitoring System
14.7 Video Meeting System
14.8 Access Guard Management System
14.9 Training Simulator
14.10 Cabling
14.11 Information Security