GB50660-2011大中型火力发电厂设计规范(英文版)
上QQ阅读APP看本书,新人免费读10天
设备和账号都新为新人

7.5 Screening and Crushing Devices

7.5.1 The coal handling system shall be provided with screening and crushing devices.As for the fossil fired power plants that permanently receive coal whose particle size meets the requirements on particle size of coal delivered to the mills,screen and coal crusher may not be required.

7.5.2 The screen and coal crusher should be of single stage type.The particle size of output coal shall meet the requirements on inlet particle size of the mills.