更新时间:2020-09-25 15:32:21
封面
版权信息
Announcement of the Ministry of Housing and Urban-Rural Development of the People's Republic of China
Foreword
1 General Provisions
2 Terms and Symbols
2.1 Terms
2.2 Symbols
3 Inspection of Equipment and Materials
3.1 Generic Requirements
3.2 Equipment Inspection
3.3 Materials Inspection
4 Preparation for Submarine Cable Installation
5 Installation and Testing of Land Cable and Sea Earth System
6 Installation and Testing of Submerged Plant
7 Installation of Landing Station Equipment
8 Testing of Terminal Station Equipment Functions and Performance
8.1 Testing of Submarine Line Terminal Equipment
8.2 Testing of Power Feeding Equipment
9 Testing of Function and Performance of Submarine Optical Cable System
9.1 Testing of Cable Line
9.2 Testing of Function and Performance of Digital Transmission System
9.3 Testing of Function and Performance of Power Feeding System
9.4 Testing of Function and Performance of Auxiliary System
10 Project Documentation
11 Project Acceptance
11.1 On-site Acceptance
11.2 Provisional Acceptance
11.3 Trial Operation
11.4 Final Acceptance
Explanation of Wording in This Code
List of Quoted Standards
Explanation of Provisions
Purpose of this Explanation