3.2 Equipment Inspection
3.2.1 Equipment specifications,models and quantity shall meet the requirements of the procurement contract and design document.
3.2.2 Equipment packaging shall be complete,without signs of breakage,being damped or overheating and free of significant depressions.
3.2.3 All equipment shall be checked against the packing list and properly recorded.
3.2.4 After inspection,all equipment shall be stored in a classified manner and properly marked to indicate category and quantity.Special attention shall be paid to the storage of small components to prevent loss.
3.2.5 When inspection is completed,the inspection site shall be cleaned up and the inspection results shall be subject to the confirmation of the project owner or the project supervision engineer.
3.2.6 Factory test records of equipment shall be checked to make sure that they meet the requirements of procurement contract and design document.