更新时间:2020-09-24 18:23:35
封面
版权页
Announcement of the Ministry of Housing and Urban-Rural Development of the People's Republic of China
Foreword
1 Generals
2 Terms and Abbreviation
2.1 Terms
2.2 Abbreviation
3 Basic Requirement
4 Process and Equipment
4.1 General Requirement
4.2 Process
4.4 Workshop Arrangement
4.5 Workshop Pipings
4.6 Workshop Transportation
5 General Layout
6 Power Supply and Distribution Facilities
6.1 General Requirement
6.2 Power Supply
6.3 Power Supply and Distribution System
6.4 Power Supply and Distribution Lines
7 Electrical Drive and Electrical Engineering
7.1 Low Voltage(LV)Power Supply and Distribution System
7.2 Electrical Drive
7.3 Electrical Engineering
8 Measurement Instruments
8.1 General Requirement
8.2 Measurement Instrument Equipment
8.3 Instrument Power Source
8.4 Instrument Engineering
9 Automation System
9.1 Automation System Constitution
9.2 Basic Automation System(L1)
9.3 Process Automation System(L2)
9.4 Manufacturing Execution System(MES)
9.5 Automation Engineering
10 Telecommunication Facilities
10.1 Telephone System
10.2 Wired Intercom System
10.3 Wireless Intercom System
10.4 Industrial Television System
10.5 Generic Cabling System
11 Auxiliary Facilities
11.1 Machine Repair Facilities
11.2 Laboratory Facilities
11.3 Fuel Gas Facilities
11.4 Thermal Power Facilities
11.5 Water Supply and Discharge Facilities
11.6 Heating and Ventilation Facilities
11.7 Piping Arrangement
12 Building and Structure
12.1 General Requirement
12.2 Main Building
12.3 Equipment Foundation
12.4 Auxiliary Facilities
13 Energy Conservation and Environmental Protection
13.1 Energy Conservation
13.2 Environmental Protection
14 Safety and Fire Fighting
14.1 Safety and Industrial Hygiene
14.2 Fire Fighting
Explanation of Wording in This Code
List of Quoted Standards
Explanation of Provision
Explanation of Provisions
4.3 Production Lines and Cranes
12.3 Auxiliary Facilities