上QQ阅读APP看本书,新人免费读10天
设备和账号都新为新人
13 Cable Line
13.1 Dominant Items
13.1.1 The commissioning test for the high-voltage cable shall be in accordance with those specified in Article 2.1.5 of this code.
13.1.2 Three-phase or single-phase AC single-core cable shall not be put through the steel conduit individually.