GB50402-2007烧结机械设备工程安装验收规范(英文版)
上QQ阅读APP看本书,新人免费读10天
设备和账号都新为新人

6.13 Sealing Slide and Sealing Plate

Ⅰ Dominant Item

6.13.1 Countersunk-headed screw for fixing sealing slide must lower than sliding face of the slide.

Check quantity:to check all.

Inspection method:inspection.

6.13.2 Preset thermal expansion gap for every part of sealing slide,must meet requirements of design technical document.

Check quantity:to check all.

Inspection method:to check installation quality records or to take actual measurements.

Ⅱ General Item

6.13.3 Tolerance for installation of sealing slide shall meet requirements in Table 6.13.3,see Figure 6.13.3.

Examination:to check all.

Inspection method:see Table 6.13.3.

Table 6.13.3 Tolerance for installation of sealing slide

img
img

Figure 6.13.3 To survey elevation of sealing slide

1-Trolley rail;2-Sealing slide;3-Longitudinal centerline of sintering equipment

6.13.4 Tolerance for installation of plate movable sealing plate shall meet requirements in Table 6.13.4.

Check quantity:to check all.

Inspection method:see Table 6.13.4.

Table 6.13.4 Tolerance for installation of plate movable sealing plate

img