GB50402-2007烧结机械设备工程安装验收规范(英文版)
上QQ阅读APP看本书,新人免费读10天
设备和账号都新为新人

6.7 Roller Distributor

General Item

6.7.1 Included angle between roller surface gradient and horizontal plane of sintering equipment shall meet requirements of design technical document.

Check quantity:to check all.

Inspection method:to check installation quality records.

6.7.2 Tolerance for installation of roller distributor shall meet requirements in Table 6.7.2.

Check quantity:to check all.

Inspection method:see Table 6.7.2.

Table 6.7.2 Tolerance for installation of roller distributor

img